
Just another quick update: progress is slow but steady. The sheetrock has all been put in and passed inspection, and they've started to put the layers of mud on the walls. The mud has to dry between coats and the air is really damp which slows this down, so this is a lengthy process (several days). It's exciting to see the walls really become solid, and we can definitely see a light at the end of the tunnel from here. There's been a lot of work done in the bathroom as well, but more on that in the next post.
Pictured: Above, the mudded sheetrock in the office. Below, the media closet, complete with the mass of wires we will eventually be hooking up to the various components therein.
No comments:
Post a Comment